Nevada guide · Updated 2026-11-14
Yerington Worksite Shower Trailer Rentals for Solar and Transmission Crews
What a federally approved solar project in Lyon and Mineral counties, and a planned transmission substation near Yerington, mean for temporary washrooms.

Key points
- BLM's Record of Decision for the Libra Solar Project in Lyon and Mineral counties was signed September 10, 2024.
- NV Energy's 2021 Greenlink West plan starts at a new Fort Churchill Substation near Yerington; its current status is unconfirmed.
- No workforce figure is published in the BLM announcement, so crew sizes come from your own schedule.
The Bureau of Land Management announced the Record of Decision for the Libra Solar Project in Lyon and Mineral counties; the decision was signed on September 10, 2024. Yerington, the Lyon County seat (see the City of Yerington site), and Hawthorne in Mineral County are the nearest towns on our list. The announcement gives no workforce figure, and we have not confirmed the project's construction schedule.
Transmission work nearby
NV Energy's 2021 Greenlink West plan of development describes a line of about 358 miles from a new Fort Churchill Substation near Yerington to Harry Allen Substation north of North Las Vegas, with yards of 18 to 28 acres about every 50 miles and up to 250 people at peak construction. It is a 2021 planning document; check current status with the utility before you plan around it.
What a solar or line crew needs
Array fields and line corridors sit far from buildings. Put a restroom trailer near the work and a shower-restroom combo at the yard; add an ADA combo where inspectors or visitors need an accessible stall. Long jobs with traveling crews often add a laundry trailer. Size the stalls with OSHA's Table D-1 as the floor, then to your peak shift.
Delivery details: the Yerington page, the Hawthorne page, and nearby Fallon.
Sources
- BLM: Record of Decision for the Libra Solar Project: Signed September 10, 2024, for a project in Lyon and Mineral counties.
- NV Energy: Greenlink West Plan of Development, Rev. 1 (July 30, 2021, hosted by BLM): A planned 525 kV line of about 358 miles, mostly along U.S. 95, with up to 250 people at peak construction and yards about every 50 miles.
- City of Yerington (official website): City government, agendas, and services for Yerington, the Lyon County seat.
- OSHA 1926.51: Sanitation (construction): Table D-1: one toilet for 20 or fewer workers; one toilet seat and one urinal per 40 workers above that.
Links checked 2026-11-14. Figures quoted above appear on the linked pages.